12 Smith St, Parramatta NSW 2150

Demo scenario. Results shown are illustrative. Production reports are generated from uploaded evidence and stored evaluation results.

REDRisk Score: 72
0
/ 100
High Rework Risk
6
Blockers
3
Warnings
SQI Breakdown
-117Compliance failures
-10Evidence gaps

Gate Failure — Automatic RED

NCC22_EE_001: EE_001 gate failed

NCC22_EE_002: EE_002 gate failed

EE2A_001: EE2A_001 gate failed

Rule Results — Blockers (6)
RuleStatusSeverityPointsMarginReferenceDetails
EE_001GATEFAILHIGH10-1.50 stars

THRESHOLD_NOT_MET

actual: 5.5, required: 7

EE_002GATEFAILHIGH10

DOCUMENT_NOT_PROVIDED

EE_003FAILHIGH10

DOCUMENT_NOT_PROVIDED

EE_004FAILHIGH10

DOCUMENT_NOT_PROVIDED

EE_007FAILHIGH10

CONDITIONAL_NOT_MET

EE2A_001GATEFAILHIGH10NCC 2022 TBD TTBD

MISSING_INPUT

Missing: project.climate_zone

Select the project climate zone (1-8). Required for DTS validation.

Project Information
State
NSW
Submission Date
2025-08-01
NatHERS Star Rating
5.5
Whole-of-Home
No
Building Context
Climate Zone
Not set
Climate Zone Source
unknown
Building Class
Class1
Construction Type
masonry
Insulation & Glazing
Insulation R-values (added)
Roof: | Walls: | Floor:
Insulation R-values (total)
Roof: | Walls: | Floor:
Glazing Summary
Missing
Glazing Values
U-value: | SHGC:
NatHERS Assumptions Match
Not confirmed
EV Readiness
Applicable (evidence: missing)
NatHERS Declared vs Specs
ElementNatHERS DeclaredSpecs Declared
Roof R-value
Walls R-value
Floor R-value
Glazing U-value
Glazing SHGC
Validation Coverage
Insulation DTS
Not validated
Glazing DTS
Not validated
Consistency
Not validated

DTS minimums are currently validated for Climate Zones 5–6 only. Other zones will show as "Not validated" until reference data is loaded.

This is a demo evaluation. Want to run your own submissions?

Request Pilot Access

Code version: NCC 2022 base

Ruleset: clauselogic_ncc2022_energy_v0.4

Risk matrix: clauselogic_risk_matrix_v0.4

Jurisdiction config: clauselogic_ncc_jurisdiction_v0.4

Evaluated: 22/02/2026, 10:05:57 am